Offices – Milan

Seismic upgrade

2025

year of completion

Electro-Pro 20x

system installed

Active

continuous monitoring

General project description

The project to upgrade the offices of Investire SGR had the goal of ensuring the safety and continuity of business operations. This required a rapid, innovative and non-invasive solution, perfectly suited to a building situated in the heart of Milan, the ultimate smart city.

The work has led to a significant improvement in seismic performance as part of the building’s comprehensive refurbishment. Thanks to the ISAAC system, the building’s value has been further enhanced, offering an additional level of security to those who live and work there every day.

Why ISAAC

ISAAC was selected as the only company capable of offering a patented Active Mass Damper (AMD) technology that combines safety, speed, and minimal operational disruption. The AMD solution reduces seismic stresses by acting on the building’s dynamic response, with no need for invasive work on load-bearing structures or the interruption of commercial activities. Furthermore, the facades of this specific building are heritage-listed; the AMD technology enabled an external intervention, maintaining the building’s original structure without altering its appearance and thus preserving its condition.

Type of building: Multi-storey office building
Year of construction: Late 1950s
Location: Milan, Lombardy
Seismic zone: 4
Construction material: Reinforced concrete structure with steel extension
Floors and sqm: 7 floors above ground, 270 sqm per floor
Client’s objective: Seismic upgrade, increasing the structure’s safety index by +0.10
Type of intervention: Seismic upgrade
No. of ISAAC devices installed: 4 (Electro-Pro 20x)
Retrofit solutions used in partnership to achieve goal: n/a
ISAAC