Control Tower – Genoa

installation of dissipation components

2024

year of completion

Tower-Pro

system installed

Active

continuous monitoring

General project description

The project aims to demonstrate the effectiveness of the Active Mass Damper system installed on the roof section in reducing the tower’s oscillations when subjected to strong wind loads.

Starting from an initial peak acceleration of 0.58 m/s² under project wind conditions with a 200-year time frame – a value obtained through wind tunnel testing of a scale model of the structure – the use of four AMDs ensures an acceleration level in the cabin of less than 0.08 m/s² RMS.

This ensures comfort in structure intended for work purposes, such as the control tower cabin, in accordance with standard CNR-DT-207-R1-2018.

Sectional view of the cabin and crown of the Genoa Pilot Tower + AMD
Executive-design-plan-Pisa
Location: Port of Genoa
System: Active Mass Damper
Type of building: Control Tower
Units installed: 4
Client: Public Body
Status: Completed
Year: 2024
Duration of work: 18 weeks